SCOPE OF WORK INCLUDES all materials, labor, equipment and services to produce or be incorporated in such construction. Contract will be a general contract for removal of one underground storage tank and the installation of six above ground storage tanks (ASTs) for the storage of diesel fuel. Two of the four proposed diesel ASTs located adjacent to the housing clusters will be 2,500 gallons, and the other two will be 3,000 gallons. The two diesel ASTs adjacent to the Central Plant will both be 12,000 gallons. The existing generators and day tanks will remain as is, and the piping components connecting them together will be replaced as needed with schedule 40 carbon steel piping in the sizes indicated on the plan sheets.