Bid Information
Type
|
COCS - Request for Qualifications - Electronic
|
Status
|
Issued
|
Number
|
23-026 (Dowling Rd Pump Station (DRPS) to Wellborn Waterline Rehabilitation)
|
Issue Date & Time
|
1/3/2023 11:04:58 AM (CT)
|
Close Date & Time
|
2/7/2023 02:00:00 PM (CT)
|
Notes
|
It is the City’s intent that the successful Firm will be involved for the full duration of the design development, preparation of construction and bidding documents, and construction administration phases of the project.
The budget for this project is approximately $6,340,000 A general description of the scope of work for this project is provided below.
The purpose of this project is to provide a new, functional, waterlines between the Dowling Road Pump Station (DRPS) and Wellborn Rd. Waterline diameter includes, but may not be limited to, 48-inch water line, 42-inch water line, 30-inch water line, and 24-inch water line for the City of College Station water distribution system between the Dowling Road Pump Station and Wellborn Road. The project includes the abandonment and/or removal of existing lines.
The selected firm shall perform the services necessary to develop the Design Criteria Package. Deliverables for this project include but are not limited to, construction drawings to include, specifications and permit drawings, and permit applications.
|
|