Item # 1:
|
FLOOR PREPARATION AND INSTALLATION OF COATING WITH ANTI-SLIP ADDITIVE TO CREATE A SAFE NON-SLIP SURFACE FOR THE PORT OF HOUSTON AUTHORITY (PHA) TURNING BASIN TERMINAL EQUIPMENT SHOP BREAKROOM LOCATED AT 7300 CLINTON DRIVE, GATE 8, HOUSTON, TX 77020. PLEASE NOTE: SITE VISIT IS NOT MANDATORY; SCOPE: THE AREA IS A 40 FT X 80 FT SQUARE OF FLOORING LOCATED INTERNALLY TO THE MAINTENANCE SHOP, THE AREA CONSISTS OF JOINTS AND DIFFERENT AREAS OF CONCRETE WHERE THE FLOORS HAVE BEEN BROKEN UP AND REPLACED AND PAINTED IN SOME AREAS WITH THE SAME CITIDEL PRODUCTS. THE CONCRETE FLOOR IS SATURATED WITH OIL AND HAS MANY IMPERFECTIONS AND THERE ARE MULTIPLE FLOOR PROTRUSIONS THAT PROVIDE ELECTRICAL FOR THE MACHINERY. METAL STUD WALLS WILL BE IN PLACE AND CONTRACTOR WILL HAVE TO WORK AROUND THE AREAS IN QUESTION. PORT HOUSTON WILL REMOVE ALL MACHINERY AND OTHER OBSTICLES PRIOR TO START OF WORK. THE EXPECTATION OF THIS SERVICE IS TO PROVIDE A WALKABLE AESTHETICALLY PLEASING FLOOR SURFACE WITH MINIMAL IMPERFECTIONS TO BE USED AS A BREAKROOM. 1) SHOT BLAST AND/OR DIAMOND GRIND AND COMPLETELY VACUUM AREA TO A SMOOTH DUSTLESS STATE TO PROVIDE A SUPERIOR PENETRATION OF VAPOR BARRIER COATING MINIMIZING PITS AND FLOOR IMPERFECTIONS FLOOR MUST BE COMPATIBLE TO ASTM C722-18 STANDARDS FOR MONOLITHIC COATINGS. PREPARATIONS FOR A CITADEL EPOXY/POLYUREA/POLYURETHANE FLOOR COATING SYSTEM. AREAS OF THE FLOOR WILL NEED AN INSPECTION FOR UNEVEN AREAS. THESE MUST BE FLOATED TO A SMOOTH SURFACE PRIOR TO THE COATINGS; 2) FILL IN ANY IMPERFECTIONS WITH SUBSTRATE THAT WILL ADHERE TO THE FLOOR AND VAPOR BARRIER MAKING IT LEVEL AS POSSIBLE; 3) APPLY 1 COAT OF CITADEL ULTRA HYDRO STOP H2O VAPOR BARRIER APPLIED AT 150 SQ FT PER GALLON; 4) AREAS THAT NEED FLOATING ARE TO BE FLOATED ON TOP OF THE VAPOR BARRIER USING CITADEL SLE100 BEING A 100% SOLIDS EPOXY WITH ADDED FUMED SILICA OR CELLULOSE AT A RATE DETERMINED TO FILL IMPERFECTIONS. (INSPECTION PRIOR TO THE BID MAY BE REQUIRED); 5) APPLY 1 COAT OF 2 PART CITADEL POLY350 POLYUREA PIGMENTED TO MATCH TEXTURE COLOR AS THE PRIMER COAT, APPLIED AT 150 SQ FT PER GALLON;6) APPLY A FULL BROADCAST OF THE SELECTED 1/4 IN. TEXTURE COLOR, TBD; 7) SCRAPE, SAND AND CLEAN UP EXCESSIVE AND LOOSE TEXTURE PRIOR TO TOPCOATS; 8) APPLY 1 COAT OF 2 PART CITADEL RG80 POLYASPARTIC AS THE BUILD COAT ON TOP OF TEXTURE, APPLIED AT 120 SQ FT PER GALLON; 9) APPLY 1 COAT OF 2 PART CITADEL RG80 TOPCOAT APPLIED AT 350 SQ FT PER GALLON; 10) ADD A 240 LB MESH ALUMINUM OXIDE WITH FINAL COAT AT 1 LB PER GALLON OF URETHANE FOR DESIRED SCRATCH RESISTANCE. CONTRACTOR MUST BE CERTIFIED BY CITADEL FLOORS AS AN INSTALLER OF THEIR PRODUCTS AND MUST PRODUCE A CERTIFICATE AS A LICENSED INSTALLER DIRECTLY FROM CITADEL FLOORS COPYRIGHT CITADEL FLOORS ALL RIGHTS RESERVED WARRANTY MINIMUM 5-YEAR WORKMANSHIP WARRANTY; PRODUCT WARRANTY SUPPLIED BY CITADEL FLOORS. CONTRACTOR IS RESPONSIBLE FOR HAVING VALID IDENTIFICATION FOR EVERY WORKER THAT COMES INTO 7300 CLINTON DRIVE. THE REQUIREMENTS HERE HTTPS://PORTHOUSTON.COM/PORT-SECURITY/SAFETY-AND-CREDENTIAL-INFORMATION/ WORKING HOURS ARE FROM 0800-1200 AND 1300-1700 WEEKDAYS. PROJECT WILL BE SUPERVISED BY PORT PERSONNEL. IF WORK HOURS GO INTO AN OVERTIME (12-1PM) THAT EVOLUTION MUST BE APPROVED BY THE MAINTENANCE MANAGER 24 HOURS PRIOR TO THE START OF DAY. ALL EMPLOYEES MUST HAVE TWIC CARD AND/OR ESCORT PRIVILAGES; CONTRACTOR MUST GET APPROVAL TO WORK FROM THE MAINTENANCE MANAGER AT LEAST 72HOURS PRIOR TO ARRIVAL AND WILL HAVE 7 CONSECUTIVE DAYS TO COMPLETE THESE REPAIRS; CONTRACTOR SHOULD BE ABLE TO WORK AFTER HOURS TO ENSURE VAPOR BARRIER HAS 12 HOURS TO CURE FULLY BEFORE APPLYING THE BUILD COAT; CONTRACTOR MUST PROVIDE HOOKUPS AND EQUIPMENT, NOTABLY GENERATORS, IF THEIR EQUIPMENT ISN'T COMPATIBLE WITH A STANDARD 115V/15A CIRCUIT. PLEASE DIRECT ALL INQUIRIES VIA THE QUESTION-AND-ANSWER SECTION OF THE PROPOSAL; NO PHONE CALLS OR EMAILS.
|
|
Qty
|
Unit Cost
|
UOM
|
Tax Rate
|
Tax Amount
|
Total Cost
|
This item is narrative
|
|
|
|
|
Item # 2: ( 360 - 20 )
|
SHOT BLAST AND/OR DIAMOND GRIND AND COMPLETELY VACUUM AREA TO A SMOOTH DUSTLESS STATE TO PROVIDE A SUPERIOR PENETRATION OF VAPOR BARRIER COATING MINIMIZING PITS AND FLOOR IMPERFECTIONS FLOOR MUST BE COMPATIBLE TO ASTM C722 - 18 STANDARDS FOR MONOLITHIC COATINGS. PREPARATIONS FOR A CITADEL EPOXY/POLYUREA/POLYURETHANE FLOOR COATING SYSTEM. AREAS OF THE FLOOR WILL NEED AN INSPECTION FOR UNEVEN AREAS. THESE MUST BE FLOATED TO A SMOOTH SURFACE PRIOR TO THE COATINGS.
|
|
NIGP Code:
|
360-20
Floor Covering, Seamless, All Types
|
Qty
|
Unit Cost
|
UOM
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 3: ( 360 - 20 )
|
FILL IN ANY IMPERFECTIONS WITH SUBSTRATE THAT WILL ADHERE TO THE FLOOR AND VAPOR BARRIER MAKING IT LEVEL AS POSSIBLE.
|
|
NIGP Code:
|
360-20
Floor Covering, Seamless, All Types
|
Qty
|
Unit Cost
|
UOM
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 4: ( 360 - 20 )
|
APPLY 1 COAT OF CITADEL ULTRA HYDRO STOP H2O VAPOR BARRIER APPLIED AT 150 SQ FT PER GALLON.
|
|
NIGP Code:
|
360-20
Floor Covering, Seamless, All Types
|
Qty
|
Unit Cost
|
UOM
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 5: ( 360 - 20 )
|
AREAS THAT NEED FLOATING ARE TO BE FLOATED ON TOP OF THE VAPOR BARRIER USING CITADEL SLE100, BEING A 100% SOLIDS EPOXY WITH ADDED FUMED SILICA OR CELLULOSE AT A RATE DETERMINED TO FILL IMPERFECTIONS. (INSPECTION PRIOR TO THE BID MAY BE REQUIRED)
|
|
NIGP Code:
|
360-20
Floor Covering, Seamless, All Types
|
Qty
|
Unit Cost
|
UOM
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|