Texas Bids > Bid Detail

Carbon Pump Station

Agency: Irving
Level of Government: State & Local
Category:
  • 43 - Pumps and Compressors
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD16053793244796735
Posted Date: Dec 8, 2022
Due Date: Dec 15, 2022
Solicitation No: 017J-23F

Bid Information



Type
Competitive Sealed Bid
Status
Issued
Number
017J-23F Addendum 2 (Carbon Pump Station)
Issue Date & Time
11/11/2022 01:44:10 PM (CT)
Close Date & Time
12/15/2022 03:00:00 PM (CT)
Time Left 6 days 20 hours 4 minutes 29 seconds
Notes

*See attachments Addendums 1 through 3.


The work to be performed under this contract consists of the Carbon Pump Station Improvements including a new 33 MGD pump station with five horizontal split case pumps, motors and VFDs (including one alternate bid), and supporting appurtenances. The project also includes 1,845 LF of 24-, 36- and 42-inch water lines with associated appurtenances and demolition of the existing Carbon Pump Station facilities, located at 4041 Carbon Road Irving, TX 75038


The City of Irving strongly encourages bidders to submit their response to this bid electronically. Please call the individual listed on the bid if you require assistance with this submittal. Electronic bidding will eliminate errors and unnecessary work, and is more friendly to the environment. Your cooperation is greatly appreciated.


Contact Information
Name
Joseph Navarre, Purchasing Agent
Address
835 W. Irving Blvd
Irving, TX 75060 USA
Phone
972 (721) 3743
Fax
Email
jnavarre@cityofirving.org




Bid Documents






Document name Format

Bid Invitation (please login to view this document)

Acrobat / PDF


Bid Attachments





















File Name Description File Size


Data pager



Data pager

Page size:


PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50



27 items in 2 pages

Addendum No. 3.pdf (please login to view this document)
017J-23F Addendum 3 3.44 MB

017J-23F Addendum 2.pdf (please login to view this document)
017J-23F Addendum 2 1.05 MB

017J-23F Addendum 1_signed.pdf (please login to view this document)
017J-23F Addendum 1 2.14 MB

017J-23F Project Overview.pdf (please login to view this document)
Project Overview 614 KB

017J-23F Plans.pdf (please login to view this document)
Plans 179.93 MB

017J-23F Specifications.pdf (please login to view this document)
Specifications 130.26 MB

017J-23F Pump Submittal Data Sheet Revised.pdf (please login to view this document)
017J-23F Pump Submittal Data Sheet Revised 147 KB

A-4 Standard Terms and Conditions Construction.pdf (please login to view this document)
A-4 277 KB

B-1 General Instructions.pdf (please login to view this document)
B-1 172 KB

B-2 Special Instructions.pdf (please login to view this document)
B-2 89 KB

C-1 Instructions for Conflict of Interest.pdf (please login to view this document)
C-1 108 KB

C-2 Conflict of Interest Questionnaire.pdf (please login to view this document)
C-2 798 KB

C-4 Certificate of Intersted Parties Form.pdf (please login to view this document)
C-4 81 KB

C-5 TGC 2271 Form.pdf (please login to view this document)
C-5 301 KB

C-7 TGC 2274 Form.pdf (please login to view this document)
C-7 211 KB



Bid Questions
















Question
Plan sheet A-13. Section 1 calls out a French drain system at the foundation of the pipe gallery. However, this piping is not shown elsewhere, will this be required and where does the system drain too?
Answer French drain is not needed and was included in error. All references to french drains to be removed.
Submitted 12/7/2022 02:31:03 PM (CT)


Question
Plan sheet A-3. Note 20 call out new chain link fencing along the west property line. Is the contractor required to replace the entire existing chain link fence along the west property line?
Answer Yes, all fence along the property line must be 8-ft chain link fence.
Submitted 12/7/2022 02:29:53 PM (CT)


Question
Plan sheet DT-2. Detail 7 requires CLSM embedment for C303 pipe that has 12ft of cover or greater. Confirm that cover is measured from the top of the pipe to existing grade. If confirmed, the only section of pipe meeting this requirement is the offsite 36” pipe from approximately stations 4+00 to 6+00. Confirm that this is the only section of pipe that the engineer will require CLSM embedment.
Answer This is measured from the top of pipe to existing grade. There are areas where the 24" pipe crosses Carbon Road that exceed this depth, as well as the 36" Discharge Pipeline B. Other specific areas requiring flowable fill are noted in plans (C-26, C-31, etc.)
Submitted 12/7/2022 02:29:31 PM (CT)


Question
Attachment E. Will the Chemical Metering Pump pre-negotiated package pricing and scope be made available soon?
Answer Yes, this is provides as part of Addendum No 1.
Submitted 12/7/2022 02:27:36 PM (CT)


Question
Specification 41-22-13.13. Section 2.07.B states that grease fittings shall extend to the service platform. However, a service platform is not specified nor typical of a single girder bridge crane. Confirm if a service platform will be required.
Answer Service platform is not required.
Submitted 12/7/2022 02:27:16 PM (CT)


Question
Specification 02-96-00. Section 3.03 lists the average and peak flows. Are flows available for each bypass location so the bypass system can more accurately designed?
Answer Additional flows will be forthcoming in Addendum No. 3.
Submitted 12/7/2022 02:24:16 PM (CT)


Question
Specification 01-50-00. Confirm that the contractor will need to supply an office for the OPT complete with all the furnishings and equipment detailed in section 2.02.
Answer See revised specification in Addendum No. 3.
Submitted 12/7/2022 02:23:57 PM (CT)


Question
Bid Item B3 and B4. Spec section 01-29-01 1.04.B Item B3 states that this item shall consist of additional vertical linear footage for depths greater than 26vf, and that drilled shafts depths less than or equal to 26vf are subsidiary to Item B2. Plan sheet S-10 lists the drilled shaft schedule and required penetration for each shaft designation. Can the drilled shaft bid item be simplified and clarified to include the entire footage of the drilled shafts (26vf plus penetration per schedule) and not just overages?
Answer At this time, this modification is not anticipated to the bid form.
Submitted 12/7/2022 02:23:32 PM (CT)


Question
Does the City own or have any additional adjacent or nearby property that can be used for a laydown yard and stockpiling of materials?
Answer The City does not have any additional adjacent areas that may be used. Please see note 6 on G-10.
Submitted 12/7/2022 02:22:36 PM (CT)


Question
Is the efficiency evaluation and penalty requirement for the 4 pumps also required for the 5th pump (alternate)?
Answer The efficiency evaluation will not be separately performed for the 5th pump. If included, the 5th pump will be selected based on the efficiency evaluation of the 4 pumps.
Submitted 12/7/2022 09:34:26 AM (CT)

Items 1 - 10 shown of 54 • Page 1 of 5 shown

First 1 2 3 4 5 ... > Last




TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >