Texas Bids > Bid Detail

CR 58 Widening from CR 48 To Savannah Development Project Number STP 1702 (437) MM-TxDOT CSJ 0912-31-304

Agency: Brazoria County
Level of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Opps ID: NBD13459559962885158
Posted Date: Jul 27, 2023
Due Date: Aug 18, 2023
Solicitation No: 23-75
Source: https://brazoriacounty.bonfire...
Project: CR 58 Widening from CR 48 To Savannah Development Project Number STP 1702 (437) MM-TxDOT CSJ 0912-31-304
Ref. #: 23-75
Type: ITB
Status:
Open Date:
Close Date:
Days Left:
Project Description:

This project is for construction of the widening of CR 58 from a two-lane undivided asphalt roadway to a four-lane concrete boulevard roadway. The project scope also includes reconstructing an existing local unpaved street, Angelina Drive, as a two-lane undivided roadway from CR 48 to Victoria Avenue. The project consists of grading, removals, reinforced concrete pavement, asphalt stabilized base, cement stabilized base, lime treated subgrade, shared use path, drainage swales, storm sewer, detention basins, SW3P, signal work, driveways, and MUD No. 21 waterline and force main relocations. The approximate project limits are from CR 48 to Savannah Development which is approximately 0.55 miles.

Important Events:
Commodity Codes:
NIGP 91327 Construction, Highway and Road