Texas Bids > Bid Detail

Headworks Rehabilitation, Wastewater Treatment Facility No. 2

Agency: County of Brazos
Level of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD14316851329681702
Posted Date: Apr 1, 2023
Due Date: May 4, 2023
Solicitation No: 23-0021-A
Source: https://brazosbid.ionwave.net/...
Bid Information
Type SJRA - Request for Competitive Sealed Proposal
Status Issued
Number 23-0021-A (Headworks Rehabilitation, Wastewater Treatment Facility No. 2)
Issue Date & Time 3/31/2023 12:00:01 PM (CT)
Close Date & Time 5/4/2023 11:00:00 AM (CT)
Notes
The San Jacinto River Authority is requesting Competitive Sealed Proposals (CSP) for the following project in Montgomery County, The Woodlands, Texas CSP No. 23-0021 – Headworks Rehabilitation, Wastewater Treatment Facility No. 2 (Woodlands Division).
SCOPE OF SERVICES: The location of the proposed project is at San Jacinto River Authority Wastewater Treatment Facility No. 2 at 5402 Research Forest Dr., The Woodlands, Texas 77381. This project includes repair of deteriorated concrete at the headworks structure within all screening and conveyance channels, aerated grit chamber, and exterior walls, and apply a protective coating in areas susceptible to biogenic sulfide corrosion; replacement of all slide gates, pipe supports, anchoring for replaced items, and miscellaneous metals within the headworks structure and underneath the existing cover; installation of a new access walkway spanning the area between the headworks structure and flow split structure; and replacement of the riser piping inside the existing on-site wet well. A temporary bypass piping system will be connected to the lift station discharge piping and discharged directly into the aeration basin flow split structure, bypassing the headworks during the entire duration of the work. A temporary macerator will most likely be installed upstream of the lift station in an existing manhole to aid in temporary screening.

Engineer's opinion of probable construction cost: $ 1,793,000.00
Estimated project schedule: Substantial Completion within 360 calendar days after NTP.
Please login to download the bid documents. For the bid schedule, please view the CSP Front-end document.
For assistance with Brazos Valley e-Marketplace System, please email or call:
support@ionwave.net

P: 866.277.2645

Contact Information
Name Kim Robbins Senior Buyer
Address 1577 Dam Site Road
Conroe, TX 77304 USA
Phone (936) 588-7118
Fax
Email krobbins@sjra.net

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >