Texas Bids > Bid Detail

Invitation to Bid for Plum Creek Phase 2

Agency: Kyle
Level of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD15300016869180377
Posted Date: Dec 21, 2023
Due Date: Feb 1, 2024
Source: https://www.cityofkyle.com/cit...

Bid/RFP Status: Open - accepting bids and proposals Bid/RFP Due Date: Thursday, February 1, 2024 - 2:00pm Back to Bids/RFPs Separate sealed bids addressed to the City of Kyle, ATTENTION: CITY ENGINEER, will be received until 2:00 p.m. on February 1, 2024, at the City of Kyle Public Works Building located at 520 E. RM 150 in Kyle, Texas, 78640 at which time they will be publicly opened and read aloud, for furnishing all labor, material, tools and equipment and performing all work required for PLUM CREEK PHASE 2, including: Construction of new road facilities Avenue A, Cromwell, and Heroes Memorial Drive roads (2,600 LF), Signage and Striping, TxDOT driveway connections (2), Back-of- Curb Landscape Improvements, Cultural Trail, Storm Sewer and Collection System (2,200 LF), Sanitary Sewer Infrastructure (1,200 LF), Water Infrastructure (2,700 LF), Dry Utilities – Electric and Telecommunications (2,200 LF), Streetlighting, and Erosion Control Measures as shown on drawings. Misc.: Clearing & Grubbing and Existing Utility Removal as shown on drawings. Bids must be submitted on the Bid Form provided and must be accompanied by a bid security in a penal sum approximately equal to and not less than five percent (5%) of the total amount of the bid. The security shall be in the form of a certified check or cashier’s check, or bid bond furnished by a reliable surety company having authority under the laws of Texas to write surety bonds in the amount required, with such security made payable without recourse to the City of Kyle. The envelope containing the bid shall indicate clearly on the front that the bid is for the PLUM CREEK PHASE 2 project. The final Notice of Award of Contract shall be given to the successful bidder by the City of Kyle within seventy-five (75) days following the opening of bids and no bidder may withdraw his bid within seventy-five (75) days after opening thereof. The successful Bidder must furnish a payment bond and performance bond, when required, on the form provided in the amount of one hundred percent (100%) of the contract amount from a surety company holding a permit from the State of Texas to act as surety. No fax submissions will be accepted. No late submissions will be accepted. All submissions received after the deadline will be returned unopened. State statutes including wage and hour provisions and contract regulations must be adhered to as they relate to this project. Contractors will be required to comply with all applicable Equal Employment Opportunity laws and regulations. Complete Contract Documents have been provided to CivCast USA for immediate download. Please go to www.civcastusa.com. The Project ID is “PLUM CREEK PHASE 2”. Prospective Bidders shall address written inquiries through the project’s CivCast website. Hard copies of contract documents are not available. A non-mandatory pre-bid virtual conference will be held on January 11, 2024, at 2:00 p.m. Please send an email to Aron Trevizo Aron.Trevizo@WGInc.com by January 9, 2024, at 5:00 p.m. to request an invite to virtual meeting. A link to attend the meeting will also be posted on www.civcastusa.com. Bidders should carefully examine the plans, specifications and other documents, visit the site of work, and fully inform themselves as to all conditions and matters which can in any way affect the work or the cost thereof. Should a bidder find discrepancies in, or omissions from, the plans, specifications or other documents, or should be in doubt as to their meaning, bidder should notify the Project Engineer via www.civcastusa.com. Obtain clarification prior to submitting any bid, but no later than 5:00 p.m. on January 19, 2024. Answer to the questions pertaining to the bid and addendums will be posted on www.civcastusa.com no later than 5:00 p.m. on January 26, 2024. Bidder shall be responsible to check the www.civcastusa.com site before submitting bid. The right is reserved, as the interest of the City of Kyle may require, to reject any and all bids and to waive any informalities in bids received. Leon Barba, PE City Engineer - City of Kyle Supporting Documents Invitation to Bid for Plum Creek Phase 2 (154 KB)

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >