Item # 1: ( 907 - 42 )
|
FILE NO.: 2023-0076 MINUTE NO.: ___________ FORMAL-FURNISH ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, SUPPLIES, SUPERINTENDENCE, INSURANCE, INCIDENTALS, AND ALL OTHER THINGS NECESSARY TO PERFORM CONSTRUCTION MATERIAL TESTING SERVICES FOR CONSTRUCT WHARF 7 AT BAYPORT CONTAINER TERMINAL ALL IN ACCORDANCE WITH CONTRACT DATED ___________. ALL INVOICES AND CORRESPONDENCE SHALL BE ADDRESSED TO THE ATTENTION OF CRAIG KASPER, P.E. A CERTIFICATE OF INSURANCE MUST BE PROVIDED PRIOR TO COMMENCEMENT OF ANY WORK. THE PORT AUTHORITY MAY AT ITS OPTION, CANCEL THIS PURCHASE ORDER AT ANY TIME AND PAY THE CONSULTANT FOR ACTUAL SERVICES PERFORMED BASED ON THE WORK PERFORMED UP UNTIL RECEIPT OF SUCH WRITTEN NOTICE.
|
|
NIGP Code:
|
907-42
Geotechnical - Soils
|
Qty
|
Unit Cost
|
UOM
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 2: ( 907 - 75 )
|
SUBSEQUENT NIGP CODE
|
|
NIGP Code:
|
907-75
Site Assessment and Site Field Observation
|
Qty
|
Unit Cost
|
UOM
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 3: ( 907 - 83 )
|
SUBSEQUENT NIGP CODE
|
|
NIGP Code:
|
907-83
Testing Services
|
Qty
|
Unit Cost
|
UOM
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 4: ( 912 - 75 )
|
SUBSEQUENT NIGP CODE
|
|
NIGP Code:
|
912-75
Quality Control Testing Services for Construction
|
Qty
|
Unit Cost
|
UOM
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 5: ( 925 - 46 )
|
SUBSEQUENT NIGP CODE
|
|
NIGP Code:
|
925-46
Geotechnical Engineering
|
Qty
|
Unit Cost
|
UOM
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|