Header Information
|
Bid Number:
|
00002636
|
Description:
|
FORMAL-CSP CONSTRUCT WHARF 7 AT BAYPORT CONTAINER TERMINAL
|
Bid Opening Date:
|
06/14/2023 11:00:00 AM
|
Purchaser:
|
Tanika Chukwumerije
|
Organization:
|
Port of Houston Authority
|
Department:
|
72820 - PROJECT AND CONSTRUCTION MANAGEMENT
|
Location:
|
72820 - PROJECT AND CONSTRUCTION MANAGEMENT
|
Fiscal Year:
|
23
|
Type Code:
|
CP - CSP - Competitive Sealed Proposal
|
Allow Electronic Quote:
|
No
|
Alternate Id:
|
|
Required Date:
|
02/21/2023
|
Available Date :
|
02/21/2023 03:08:40 PM
|
Info Contact:
|
Contact Tanika Chukwumerije Procurementproposals@porthous
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
Pre-Proposal Meeting on March 16, 2023 at 9:00 AM held via WebEx. Site Visit will be held on March 22,2023 at 2:00 PM at Bayport Admin Bldg, 12621 Port Rd, Seabrook, TX 77586 in large conference rm.*A BID BOND OF 5% MUST BE SUBMITTED WITH PROPRPOSAL*
|
Bulletin Desc:
|
This project consists of 1,000 linear feet of new wharf construction at Bayport Container Terminal. The scope includes dredging of approximately 300,000 cubic yards of wet and dry excavation, drilled shaft foundations, structural concrete, mooring pier, west end retaining wall, fender systems, utilities, and a one-story pre-cast concrete stevedore support building. Also, clearing, grubbing, and placement of fill in a dredge material placement area.
|
|
Ship-to Address:
|
Roger H. Hoh
111 EAST LOOP NORTH (exit 29)
HOUSTON, TX 77029
US
Email: pcminvoicing@POHA.COM
Phone: (713)670-2523
|
Bill-to Address:
|
|
Print Format:
|
Bid Print
|
File Attachments:
|
TERMS AND CONDITIONS .pdf
CSP-2636_Construct_Wharf_7_BAY.pdf
PRE-PROPOSAL MEETING WEBEX INSTRUCTIONS
ADDENDUM NO. 1
ADDENDUM NO. 2
PRE-PROPOSAL MEETING RECORDING
PRE-PROPOSAL MEETING ATTENDEE LIST
ADDENDUM NO. 3
ADDENDUM NO. 4
DRONE FLYOVER
PHOTOS
PRE-PROPOSAL MEETING POWERPOINT
ADDENDUM NO. 5
|
Form Attachments:
|
|
Legal Contract:
|
Contract Required
|
Amendments:
|
Amendment #
|
Amendment Date
|
Amendment Note
|
1
|
02/22/2023 12:56:22 PM
|
Administrative addendum. No signed acknowledgment required. Attachment File Changes: Header 1. File 'PRE-PROPOSAL MEETING WEBEX INSTRUCTIONS': File 'PRE-PROPOSAL MEETING WEBEX INSTRUCTIONS' added .
|
2
|
02/23/2023 12:43:04 PM
|
THE BUYSPEED URL HAS BEEN UPDATED. USE HTTPS://BUYSPEED.PORTHOUSTON.COM TO ACCESS THE SOLICITATION PACKAGE. ADMINISTRATIVE ADDENDUM. NO SIGNED ACKNOWLEDGEMENT REQUIRED.
|
3
|
03/07/2023 01:10:40 PM
|
Include the 2-page signed addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 1': File 'ADDENDUM NO. 1' added .
|
4
|
03/14/2023 12:22:53 PM
|
Include the signed 1-page addendum acknowledgment with the emailed proposal response. Header 1. Pre-Bid Conference changed from "Pre-Proposal Meeting on March 16, 2023 at 9:00 AM held via WebEx. Site Visit on March 16,2023 at 2:00 PM at Bayport Admin Bldg, 12621 Port Rd, Seabrook, TX 77586 in large conference room. *A BID BOND OF 5% MUST BE SUBMITTED WITH PROPRPOSAL*" to "Pre-Proposal Meeting on March 16, 2023 at 9:00 AM held via WebEx. Site Visit will be held on March 22,2023 at 2:00 PM at Bayport Admin Bldg, 12621 Port Rd, Seabrook, TX 77586 in large conference rm.*A BID BOND OF 5% MUST BE SUBMITTED WITH PROPRPOSAL*". Attachment File Changes: Header 1. File 'ADDENDUM NO. 2': File 'ADDENDUM NO. 2' added .
|
5
|
03/17/2023 06:43:43 AM
|
Administrative addendum. No signed addendum acknowledgment required. Attachment File Changes: Header 1. File 'PRE-PROPOSAL MEETING RECORDING': File 'PRE-PROPOSAL MEETING RECORDING' added . 2. File 'PRE-PROPOSAL MEETING ATTENDEE LIST': File 'PRE-PROPOSAL MEETING ATTENDEE LIST' added .
|
6
|
03/23/2023 12:51:04 PM
|
Include the signed 5-page addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 3': File 'ADDENDUM NO. 3' added .
|
7
|
04/06/2023 12:22:31 PM
|
Include the 2-page signed addendum acknowledgment with the emailed proposal response. Attachment File Changes: Header 1. File 'ADDENDUM NO. 4': File 'ADDENDUM NO. 4' added .
|
8
|
04/06/2023 03:41:54 PM
|
Drone Flyover Video of site. Attachment File Changes: Header 1. File 'DRONE FLYOVER': File 'DRONE FLYOVER' added .
|
9
|
04/12/2023 07:05:42 PM
|
Administrative addendum. No signed addendum acknowledgment is required. Attachment File Changes: Header 1. File 'PHOTOS': File 'PHOTOS' added . 2. File 'PRE-PROPOSAL MEETING POWERPOINT': File 'PRE-PROPOSAL MEETING POWERPOINT' added .
|
10
|
04/18/2023 02:50:15 PM
|
Include the signed 1-page addendum acknowledgment with the emailed proposal. Header 1. Bid Opening Date changed from "05/10/2023 11:00:00 AM" to "06/14/2023 11:00:00 AM". Attachment File Changes: Header 1. File 'ADDENDUM NO. 5': File 'ADDENDUM NO. 5' added .
|
|
|
Item # 1: ( 905 - 05 )
|
FILE: 2023-0055 MINUTE NO. ________ FORMAL-FURNISH ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, SUPPLIES, SUPERINTENDENCE, INSURANCE, INCIDENTALS, AND ALL OTHER THINGS NECESSARY TO PERFORM SERVICES FOR CONSTRUCT WHARF 7 AT BAYPORT CONTAINER TERMINAL ALL IN ACCORDANCE WITH CONTRACT DATED ______________. ALL INVOICES AND CORRESPONDENCE SHALL BE ADDRESSED TO THE ATTENTION OF CRIAG KASPER, P.E. A CERTIFICATE OF INSURANCE MUST BE PROVIDED PRIOR TO COMMENCEMENT OF ANY WORK. THE PORT AUTHORITY MAY AT ITS OPTION, CANCEL THIS PURCHASE ORDER AT ANY TIME AND PAY THE CONSULTANT FOR ACTUAL SERVICES PERFORMED BASED ON THE WORK PERFORMED UP UNTIL RECEIPT OF SUCH WRITTEN NOTICE.
|
|
NIGP Code:
|
905-05
Aerial Photography and Videography Services, Including Drones
|
Qty
|
Unit Cost
|
UOM
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 2: ( 909 - 25 )
|
SUBSEQUENT NIGP CODE
|
|
NIGP Code:
|
909-25
Building Construction, Prefabricated, All Types
|
Qty
|
Unit Cost
|
UOM
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 3: ( 909 - 76 )
|
SUBSEQUENT NIGP CODE
|
|
NIGP Code:
|
909-76
Site Work
|
Qty
|
Unit Cost
|
UOM
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 4: ( 912 - 23 )
|
SUBSEQUENT NIGP CODE
|
|
NIGP Code:
|
912-23
Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.
|
Qty
|
Unit Cost
|
UOM
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 5: ( 912 - 40 )
|
SUBSEQUENT NIGP CODE
|
|
NIGP Code:
|
912-40
Demolition Services
|
Qty
|
Unit Cost
|
UOM
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|