Question
|
5) is labor required to happen outside of regular school hours, if taking place while school is in session?
|
Answer
|
Only logical configuration can happen during school hours, physical install and testing must be after school hours.
|
Submitted
|
2/14/2024 01:30:01 PM (CT)
|
|
|
Question
|
4) can a full list of locations and rooms for these systems be provided
|
Answer
|
Once the bid is awarded, maps can be provided.
|
Submitted
|
2/14/2024 01:29:51 PM (CT)
|
|
|
Question
|
3) what is the functional scope of work regarding how this system is intended/desired to function?
|
Answer
|
This would require a separate meeting.
|
Submitted
|
2/14/2024 01:29:37 PM (CT)
|
|
|
Question
|
2) is network intended to be isolated, or a part of the disctict IT infrastructure?
|
Answer
|
The devices will be on a separate sub-net from the rest of the network.
|
Submitted
|
2/14/2024 01:29:26 PM (CT)
|
|
|
Question
|
1) who is repsonsible for configuration of cisco switching equipment?
|
Answer
|
FWISD Network Engineers
|
Submitted
|
2/14/2024 01:29:13 PM (CT)
|
|
|
Question
|
Is a Valcom Warranty period of 5 years on Valcom equipment required for this project?
|
Answer
|
Yes.
|
Submitted
|
2/14/2024 12:10:04 PM (CT)
|
|
|
Question
|
For the new Valcom 1 button emergency call plates, where is the emergency button to enunciate?
|
Answer
|
That will be discussed after bid is awarded.
|
Submitted
|
2/14/2024 12:09:53 PM (CT)
|
|
|
Question
|
For the new Valcom 2 button call plates, where is each button to enunciate?
|
Answer
|
That will be discussed after bid is awarded.
|
Submitted
|
2/14/2024 12:09:46 PM (CT)
|
|
|
Question
|
It is our understanding from the pre-bid meeting that call buttons are to reuse existing conductors for the existing non-Valcom systems, in lieu of running new cable, and that of the cable is defective or hinders normal operation of the non-Valcom system, that replacing this cable will be a change order. Is this correct? If not, what is the protocol to follow for this scenario?
|
Answer
|
Yes, a change order/quote will be needed. No work outside of the original PO should be done until another PO is provided based on the change order/quote.
|
Submitted
|
2/14/2024 12:09:37 PM (CT)
|
|
|
Question
|
Who are the points of contact (POCs) for this project, and what measures are in place to manage communication and coordination among different departments throughout the project lifecycle?
|
Answer
|
Kevin Bentley is the main point of contact. However, other contacts will be provided for custodial supervisors to make sure someone is in the building at same time contractors are in the building.
|
Submitted
|
2/14/2024 12:09:23 PM (CT)
|
|
|